Tiling Works Calculator – Straight Pattern

SiteCalc Pro

🏗️ Concrete (1:2:4 Mix)

📐 Tiling (Straight Pattern)

How are these numbers calculated?

Concrete: Uses 1.54 Dry Factor + 5% Waste. Based on 1:2:4 ratio.

Tiling: Uses 10% Cutting Waste. Adhesive assumes 1 bag per 50sq.ft (4.6m²).

DISCLAIMER: Estimates only. Site conditions, bulking of sand, and installer technique vary. Verify all quantities with your local supplier before ordering. We are not liable for shortages or surpluses.

Leave a comment